Friday, February 24, 2012

Prepping the Floors–February 2012

IMG_0317IMG_0311

Task – Washing & Sanding Floors

The Process – We had to sand the floor down so that it was nice and smooth.  we used a air palm sander.  We then had to sweep, vacuum & wash the floor several times to open the pours to accept the stain.

What I Thought About It – It was very messy and not that much fun.  It was too dusty.

Friday, February 17, 2012

Hanging Drywall Board–February 2012

IMG_0262 (2)IMG_0263 (2)IMG_0267 (2)IMG_0268 (2)IMG_0269 (2)IMG_0270 (2)IMG_0272IMG_0273IMG_0279IMG_0282IMG_0283IMG_0285IMG_0301IMG_0303

Task – Hanging Ceiling Gyprock

The Process – We had to carry it into the house from the garage.  Then we set it onto the drywall lift.  Then we stood on scaffold and put the screws in.

What I Thought About It – It was quite a bit of fun.  I liked having a lift because it made our job a lot easier with 10 foot ceilings.  It also took a lot less time with the lift.