Showing posts with label Screw Piles. Show all posts
Showing posts with label Screw Piles. Show all posts

Friday, September 30, 2011

Straightening the Screw Piles–September 2011

IMG_9056IMG_9057IMG_9058IMG_9059IMG_9060IMG_9061IMG_9054IMG_9055

Task – Straightening Screw Piles

The Process – We took the bobcat and push the screw piles until they are straight.  We then took dirt and packed the dirt around them.

What I thought About it – I was not around for this part. 

Thursday, September 29, 2011

Drilling in the Screw Piles–September 2011

Task – Putting the piles into the ground.

The Process – We had someone come in with a big drill powered by hydraulics.  He hooked up the drill piles onto the drill and then drilled them into the ground.  He would continue drilling until the pile reached a certain amount of torque (how many PSI it took to turn it).  The piles were 10ft and if they needed more than 10ft they added extensions.  We decided to use screw piles because we tried to use concrete piles but the ground was soup about 8ft down.

What I thought About it – It looked like it would be a long boring job.

My Musical Drill Piles!

Wednesday, September 28, 2011

Screw Pile Delivery after Concrete Pile Failure–September 2011

IMG_9006IMG_8987IMG_8988IMG_8989IMG_8991IMG_8992IMG_8993IMG_8994IMG_8995IMG_8996IMG_8997IMG_8999IMG_9000IMG_9002

Task – Picking up the screw piles

The Process – Get the piles off the trailer using a large fork lift and set them in a central location. 

What I Thought about it – I found it interesting.  The screw piles were fun to play as an instrument! 

The