Friday, December 16, 2011

Passing the Plumbing Inspection & Boiler Installation–December 2011

IMG_0227IMG_0170 (2)IMG_0179IMG_0225

Task – install boiler & pressure test sewer lines.

The Process – Hook up manifolds to floor heat lines.  Hire plumber to install boiler and commission it.  We had to cap off all the plumbing lines and keep air pressure for 20 minutes to pass our final plumbing inspection. 

What I Thought About It – It was exciting to have heat running after all our work. 

No comments:

Post a Comment